Categories: Dental

We’ve recently added a few new case studies to our website (completed before the Coronavirus outbreak hit).

First up is Grove Dental in Aylesbury – in this 12 week fit out we took an old, disused dental clinic and transformed it into a modern surgery.

Our second case study is Dental Works in Milton Keynes. For this fit out, we converted a restaurant unit in Milton Keynes into a seven-surgery clinic plus a rentable commercial unit.  This was a sizable project that we completed in just five months.

Last, but not least, is The Cosmetic Dental Gallery in Greenwich. This was an empty-shell fit out of a five-surgery clinic.

We’ve many exciting projects in the pipeline and look forward to bringing you more updates as the lockdown ends.
Stay safe everyone!

Related Posts

  • May 9, 2023
    How to choose a clinic reception desk

    How do you go about choosing the right clinic reception desk? Read our guide on everything from materials to size.

  • April 20, 2023
    Space saving dental clinic design

    What's the best way to design a dental clinic when space is limited? Here are our tips for creating a successful space-saving dental clinic design.

  • March 9, 2023
    Why choose a specialist medical fit out company?

    If you're setting up a dental or medical clinic do you need to use a specialist medical fit out company? These are some of the risks of not using a specialist contractor.

  • January 9, 2023
    Choosing Flooring for your Dental Practice

    Flooring is a key part of your practice design. Your choice of flooring needs to be practical as well as help create the right ambience for your clinic.